One of the world’s leading planning, engineering, and program and construction management organizations contracted Integral Blue to perform physical path surveys and spectrum analysis for a major ITS design. The project included tower relocation of three major Michigan DOT communication hubs.

Integral Blue performed physical path surveys with a 100-foot bucket truck to verify line of sight and to identify any potential path obstructions. At each location, Integral Blue performed spectrum analysis in order to identify any newly required links as a result of any blocked paths.  All this information was compiled in the Integral Blue Technical Memorandum, which also included tower placement and orientation as well as link budget calculations.